Welcome to Dalian Huayang
Tel:400-901-3696
Installation Precondition for GC
  • Release time : 2018-05-15 15:48:56
  • Browsing volume:1876

Dear valued customers,

Thank you for choosing our instrument, in order to better complete the installation and commissioning work of your purchased Van-lab GC, please confirm the following readiness condition before installing.

The following to be filled by users
- Company name:
- Person in charge:
- Installation address:
- Telephone:

Confirm installation conditions
1. Instrument needs a stable laboratory bench space: length 100cm, width 60cm, height 70cm. If the computer is placed on the same platform, the length is needed to be lengthened correspondingly.
2. A three-phase plug (10A).
3. Power supply: AC 220V+/-5%, ground wire connector.

Trainee Information
- Name:
- Position:
- If trainee manipulate Windows XP
- Whether trainee use the similar instrument

DHSI Technical Department

Copyright Dalian Huayang analytical instruments Co., Ltd.All right reserved. Preparation of Liao ICP
友情鏈接: link1 link2 link3 link4 link5 link8 link9